The 4-weekly review is the part of the Safer Food, Better Business pack that gets skipped most, and in our view it is the part that justifies keeping a diary at all. The daily checks catch today's problem. The review catches the problem that happens every Tuesday. An officer scoring confidence in management is looking for evidence that somebody steps back and looks at the pattern, and this is that evidence. The review page sits with the diary in the SFBB pack for caterers ("Diary/4 weekly review"), and the government guidance on food safety management systems says to check, review and update your system regularly.
The cycle
- Daily opening and closing checks
- Weekly extra checks
- 4-weekly review
The 13 questions
The review page of the diary starts with one question: did you see any problems, or did the same issue come up in the diary three times or more? Below it sits a 12-point "safe method check list" of yes or no questions. Together that makes 13. We have shortened the pack's wording slightly and added a line on what each one is checking for.
- Did you see any problems, or did the same thing go wrong three or more times in the diary?The pattern finder. Three of the same failure means fix the cause, not the symptom.
- Have the safe methods been reviewed?Are the front pages of the folder still how you actually work?
- Has allergen information been updated after menu or ingredient changes?New dish, new supplier, new label on the same tub.
- Have any equipment or processes changed?New fryer, new delivery slot, new prep routine. Each one may change a safe method.
- Have any new suppliers been recorded?On the suppliers list with contact details and what they supply.
- Does the cleaning schedule need updating?New equipment needs a row. A deep clean that never gets done needs a different frequency or a different person.
- Have new staff been trained on all the safe methods?Recorded with dates and the trainer's name.
- Do existing staff need refresher training?Especially anyone involved in a repeated problem.
- Are any extra opening or closing checks needed?If something keeps going wrong, add a daily check for it.
- Have any food complaints been received and investigated?What was it, what did you find, what changed.
- Have probes been calibrated in the last four weeks?Ice water test, reading recorded.
- Have extra checks been completed and recorded each week?Deep cleans, dishwasher, drains, pest check.
- Are Prove It checks being completed regularly?Enough cooking, reheating and hot hold records to show the methods work.
How to get through it in 20 minutes
- 1Read the problems columnFlip through 28 days and list every failure. Group the same ones together. Anything at three or more is an action.
- 2Check the listsSuppliers, training, cleaning schedule, allergen matrix. Does each one match the kitchen as it is this month?
- 3Check the extrasProbe calibration done? Weekly extra checks noted? Prove It records present?
- 4Write the actionsWho, what, by when. Sign and date the review.
View as a table
| Step | Minutes |
|---|---|
| Read the problems column | 8 |
| Check the lists | 5 |
| Check the extras | 3 |
| Write the actions | 4 |
What the review looks like when it works
A good review is short and specific. A bad one is thirteen ticks and a signature. Compare:
Q1: Fridge 2 over 8°C on 4 mornings (3, 9, 17, 24 Oct). Engineer out 25 Oct, door seal replaced. Adding weekly seal check to cleaning schedule. Q7: New starter (Priya) trained on all safe methods 12 Oct, recorded. Q11: Probe calibrated 20 Oct, ice 0.6°C pass. All other questions: no change.
That is the whole review. It took longer to think than to write, and it shows an inspector three things at once: the diary is real (there were failures), someone reads it (the pattern was spotted), and the system changes in response (a new weekly check). That is the definition of confidence in management.
When the diary is incomplete
The review is only possible if the previous 28 days are in the diary. This is the quiet reason to keep the daily checks going: not because each day matters much on its own, but because the review needs all of them. If you have gaps, do the review anyway, note the gaps honestly as a finding, and make "complete the daily diary" the first action. We cover rebuilding from a gap in lost your SFBB folder.
In SafeTap the 4-weekly review is a screen for owners and managers. It looks back over the last 28 days of records and lists any check that failed three or more times, so step one is a glance rather than a flip through 28 pages. The checklist is the same 13 questions. The daily routine they depend on is in the SFBB daily diary explained.
Questions people ask
Who has to do the SFBB 4-weekly review?
Whoever is responsible for the food safety system, normally the manager or owner. The pack is written for the manager, who signs the diary each day and can hand the diary to another member of staff when away. The review looks at how the whole system has run, so it belongs with the person who can change it.
What counts as a problem repeated three or more times?
The same check failing three times in the four weeks: a fridge reading over 8°C on three mornings, a hot hold under 63°C three times, a delivery from the same supplier rejected three times. Three is the pack's trigger for changing something rather than fixing it again.
Is the 4-weekly review the same as a monthly review?
Nearly. The pack says every four weeks (28 days), which gives 13 reviews a year rather than 12. Doing it on the same weekday every four weeks is easier to remember than a calendar date, which is why we show it as a 28-day cycle.
What do I do with the answers?
Write them down, with any actions and who owns them. A review that says "fridge 2 failed 4 times, engineer booked for Thursday, checking seals weekly from now" is exactly what an inspector wants to see in the confidence in management section.